NOVATEC Systems for 3D Elements

The equipment is made of an outer formwork (side walls) and one or more inner formworks that can be conical or equipped with a shrinking system. It allows precast elements to be produced in different sizes ensuring utmost production flexibility and any handling step operated by hydraulic systems. An efficient vibrator, combined with a specifically designed structure, ensures a rapid filling of the formwork and an optimum concrete compaction. Each battery mould can be also provided with a heating and insulation system to accelerate the concrete element’s curing process.

  • Supplier : Putzmeister

Stay in touch

Join our mailing list to receive updates on our latest happenings